Return to Services

Design & Project Management

Design and construction 3 Our objective is to engineer simple, robust and fail safe treatment plants for manufacturing sites designed to meet effluent standards at minimum cost. Solution designs are robust and innovative and are tailored to your specific needs. Process design services in a consultative workshop format that enables our clients to maintain control of the decision making process.JJC managed projects utilise a proven team of quality specialised contractors who themselves bring skills and innovation to the project.JJC is not bound to any single technology, and selects the best technology for any given application.

Baiada Hanwood

Baiada Poultry at Hanwood near Griffith, operate a large poultry abattoir and rendering facility.  Between 2012 and 2015, JJC designed, project managed and commissioned plant to treat 1,700 ML p.a of wastewater to produce treated water for reuse in agriculture and biogas for reuse, including: Covered Anaerobic Lagoons – two each 50ML. Sequencing Batch Reactors …

Casella Winery

Casella Winery Situated in Yenda, just outside Griffith in the Riverina district of NSW, the winery is home of the famous Yellow Tail label and is one of the largest wineries in Australia. The WTP has been constructed at a site approximately 2 km from the winery and includes: Rotary screen and settling tanks 30 …

Oxford Landing Winery

Yalumba’s Oxford Landing winery Situated at Moppa, Barossa Valley, South Australia, Yalumba is treating 30ML p.a of wastewater to produce treated water for irrigation on surrounding vineyards, the plant includes: 5 ML CAL 1.5 ML lagoon based SBR 30 ML treated water Storage Lagoon. Sludge handling plant. Stormwater harvesting for shandy with treated water for …

Spring Creek Vintners

Spring Creek Vintners own and operate a 12,000T winery in the very beautiful Marlborough Region of New Zealand. Marlborough waste water treatment is at the challenging end of the industry as it comes on late and with a rush – not well suited to biological treatment. Spring Creek had some existing treatment capacity, but not …

Ten Minutes by Tractor

Ten Minutes By Tractor owns a number of vineyards on the beautiful Mornington Peninsula, and has  established its winery near Hastings. The winery is at the smaller end by Industry standards, but the desire to have best practice wastewater treatment and reuse was always front of their minds. JJC designed and project managed the construction …

The Wine Group

The Wine Group Situated in Griffith, NSW, this site is designed to process 1500 kg BOD per day using aerobic tank-based SBR, to produce treated water for reuse onsite, and disposal to sewer. Commissioned in February 2007, the plant includes: Rotary screen. Settling Tank for removal of earth. 600 kL Aerated Surge Tank and 600 …

Weilong Winery

Weilong Winery is located in Red Cliffs Victoria, just outside of Mildura in the Sunraysia wine growing district. The Winery is one of the largest greenfield projects constructed in the Australian Wine industry and the WWTP can proudly boast of being the benchmark for large scale plants. The WWTP is sized for future expansion to …

Wynns Winery

Wynns Winery Situated in Coonawarra, South Australia, this site is treating 70 ML p.a of wastewater to produce treated water for irrigation. Commissioned in 2004, the plant includes: 7.5 ML CAL 2.5  ML lagoon based SBR 40 ML treated water Storage Lagoon Sludge handling plant.